AI Proposal for Elveety Group · Parle Biscuit Plant
The Journey of a Biscuit
now enhanced by AI
How the same plant and the same people can make twice the biscuits, with less fuel per tonne
Prepared forJatin Sir, Elveety Group
Prepared byThirdEye Data
DateNovember 2026
The Journey of a Biscuit — now enhanced by AI
Before we begin
A note to you, Jatin Sir
Thank you for opening your plant to our team on 26th October. We walked the full line with you: the maida and sugar windows, the three dosing floors, the oven, the cooling belt, the packing lanes and the dispatch conveyor at the back. It is a well-run plant. The biscuit comes out the same every time and the lanes keep moving.
But a few things stayed with us after we left.
First, the number of hands still needed to keep the line going. People standing at two or three points along the cooling belt, scanning for bad biscuits, and still some defective biscuits slip through to packing. People at the lanes turning and straightening biscuits so that the packing machines do not jam. People checking packs. People counting bags and cartons.
Second, the oven. It is brought up to heat every day and burns fuel at settings fixed long ago.
Third, the clock. Your plant runs one shift, from 7 am to 7 pm. For the other twelve hours, a plant you have already paid for stands still.
You told us your two biggest worries are labour cost and fuel. So this proposal is built around a simple idea: let AI take over the repetitive checks, and use the same people to run the plant round the clock in three shifts. Same people, same machines, twice the biscuits. Labour cost and fuel per tonne both come down.
We have written it as a story, the story of one biscuit, so that anyone in your team can read it and see where AI fits into your plant.
Warm regards, Aniruddha Mukherjee Technical Program Manager, ThirdEye Data
The short version
The proposal at a glance
2× output
from the same plant: 3 shifts instead of 1
Same 21 people
no new hiring for the two extra shifts
50% lower
labour cost per tonne on these jobs (₹896 → ₹448)
8–12% less
oven fuel per tonne
We propose 12 AI use cases that work together as one end-to-end system, from the intake window to the truck. We have ranked them by value and by how easy they are to put in, and grouped them into three phases over about nine months.
Phase 1 is three quick wins: easy to install, low cost, and visible to you within weeks. Once you have seen them work on your own dashboard, we move to the next phase with your confidence and budget.
At full run-rate the plan brings about ₹1.46 Cr a year in labour cost avoided, fuel, giveaway and less recycling, plus 4,500 tonnes of extra output every year, with fewer biscuits going round the recycling loop. It is designed to pay back within 12 to 18 months.
Chapter 1
The journey of a biscuit, today
Let us follow one biscuit through your plant. We will call it Biscuit No. 1. Its journey has eight stops, and today it can only make that journey between 7 am and 7 pm.
Swipe sideways to see the whole diagram
Figure 1. The journey today. Red marks show where people do repetitive work; orange marks show where fuel is burnt.
1
Raw material intake
Maida and sugar bags come in through the intake windows. Someone counts the bags by hand and writes them in a register.
2
Dosing and mixing on three floors
On the 3rd floor, the sugar machine takes about 75 kg per batch and drops it down. On the 1st floor, the maida machine takes about 270 kg. Both meet in the 2nd-floor blender with the other ingredients and become dough.
3
Moulding
The dough goes to the biscuit die, which cuts it into the familiar shape. Biscuit No. 1 is born.
4
Baking
Biscuit No. 1 rides into the oven on a running belt and bakes at about 360 °C for about 3.5 minutes. With one shift a day, the oven has to be brought up to heat every morning, burning fuel before the first biscuit is baked.
5
Cooling, sorting and recycling
For about 3.5 minutes it cools at room temperature. 6 workers stand at two or three points along the belt, scanning thousands of moving biscuits by eye and picking out the broken, burnt, under-baked and damaged ones. Even after two or three rounds of checking, some defective biscuits are missed and travel on to the packing zone. The biscuits that are picked out are collected and sent for recycling.
6
Lanes and packing
The biscuits are lined up into 20–25 lanes. Here 8 more workers turn, flip and straighten biscuits so that they enter the packing machines the right way and do not jam. About 5 packing units pack them into ₹5, ₹10, ₹15 and ₹30 packs, and 4 checkers look at seals, print, codes and weight.
7
Cartons and storage
Packs go into boxes and cartons, which are stacked in the store by lot number. The lot tally is kept by hand.
8
Dispatch
At the back of the building, the dispatcher puts cartons on the conveyor and they drop into the truck. Cartons are counted by hand against the invoice.
Chapter 2
Where the money goes
Your plant loses money in three places: the hands on repetitive work, the hours when the plant stands still, and the fire in the oven.
Leak 1: Labour on repetitive work
Swipe sideways to see the whole diagram
Figure 2. People on repetitive jobs in today's single shift (assumed, to be confirmed in the baseline study).
This work is tiring. A worker looking at a fast belt for twelve hours starts missing defects after the first two, which is why the plant needs checks at two or three points and still sees defects reach packing; quality then depends on who is on duty that day. Wages go up every year, people leave, and every new person takes weeks to learn the job by watching others.
Station
What people do today
People (1 shift)
Cost per year
Cooling belt
Scan the belt at 2–3 points and pick out broken, burnt, under-baked biscuits by eye
6
₹11.5 lakh
Lane forming
Turn, flip and straighten biscuits before packing
8
₹15.4 lakh
Packing units
Check seal, print, batch/MRP/date code and weight
4
₹7.7 lakh
Intake, store, dispatch
Count bags, tally lots, count cartons into trucks
3
₹5.8 lakh
Total
21
₹40.3 lakh
Assumes ₹16,000 per person per month fully loaded (₹1.92 lakh a year) and about 4,500 tonnes a year from one 12-hour shift, so roughly ₹896 of labour on these jobs in every tonne.
Leak 2: A plant that works only half the day
The building, the oven, the mixers and the packing machines are paid for 24 hours a day, but they work for 12. The simple way to grow is to run more shifts. But doing that the old way means finding, hiring and training 42 more people for the same repetitive jobs. That is why most plants never do it.
Leak 3: Fuel in the oven
Swipe sideways to see the whole diagram
Figure 3. Five ways an oven burns more fuel per tonne than it needs to.
The oven is the biggest energy user in the plant. With one shift, it is brought up to temperature every morning, so a part of every day's fuel is spent before a single biscuit is baked. A little extra heat is kept as a safety margin against under-baking. Heat escapes through walls, doors and the chimney. The air-to-fuel ratio drifts over time. And nobody sees fuel per tonne on a live screen; it shows up only in the monthly bill.
If your oven fuel bill is around ₹10 lakh a month today, then at three-shift volume every 1% saved is ₹2.4 lakh a year.
Leak 4: The recycling loop
Broken, under-baked and damaged biscuits are not thrown away; they are sent for recycling. That saves the material, but the loop is not free. Every recycled kilo has already used oven fuel, labour and line time once, and it has to be collected, processed and baked a second time. The more biscuits go round the loop, the less good output the same oven and the same people can make.
Recycling loop
Today (1 shift)
At three-shift volume, if nothing changes
Biscuits sent to recycling (2% of output)
~90 tonnes a year
~180 tonnes a year
Net cost of the loop (₹35 per kg: second bake, handling, lost line time, after recovered material)
~₹31.5 lakh a year
~₹63 lakh a year
The hidden leaks
Defects that slip into packs. A broken or under-baked biscuit that gets past the manual checks ends up in a pack, which means complaints, returns and questions from the brand owner.
Pack giveaway. When packs are filled a little above the declared weight to be safe, the extra biscuit goes free to the market, pack after pack.
Count gaps. Without automatic counting at intake and dispatch, short supply and short shipments are hard to prove.
Training takes too long. New people learn by watching seniors for weeks, and the plant depends on a few experienced hands.
Chapter 3
Enter AI, one step at a time
We do not change your recipe, your oven or your packing machines. We add eyes (cameras and sensors), a brain (AI that runs right on your shop floor) and simple light signals that show your people exactly which biscuit to pick or fix. The machines take over the searching, and your people move to skilled work across three shifts.
Swipe sideways to see the whole diagram
Figure 4. The same eight stops with 12 AI use cases, coloured by the phase in which they go live.
How we have prioritised
We ranked every use case on two simple questions: how much value does it bring to your plant, and how easy is it to put in? We start with the quick wins at the top right, prove the savings to you, and then move to the bigger steps.
Swipe sideways to see the whole diagram
Figure 5. Value versus ease. Phase 1 picks the quick wins; harder items wait until the first results are in.
Use case
What it solves
Ease
Phase
UC1 · Automatic Counting
Labour, count disputes
Very easy
Phase 1
UC2 · AI Defect Highlighter
Labour, missed defects, recycling
Medium
Phase 1
UC3 · Executive Dashboard with Ask-AI
Live visibility for management
Easy
Phase 1
UC4 · Pack Inspection & Giveaway
Labour, giveaway
Easy to medium
Phase 2
UC5 · AI Lane Assist
Labour (largest group)
Medium
Phase 2
UC6 · GenAI Training Buddy
Training for new shifts
Easy
Phase 2
UC7 · Bake-Eye
Fuel, less recycling
Medium
Phase 2
UC8 · Combustion Optimiser
Fuel
Harder
Phase 3
UC9 · Oven Health Watch
Fuel, downtime
Medium
Phase 3
UC10 · Dosing Watch
Material, consistency
Medium
Phase 3
UC11 · Predictive Maintenance
Breakdowns
Harder (needs sensors)
Phase 3
UC12 · Hygiene & Safety
Audit readiness
Easy
Phase 3
Robotic biscuit aligner
Labour
Very hard
Future, if proven
Phase 1 · Months 1–3
Quick wins that build confidence
Easy to install, low cost, and visible to management within weeks.
UC1Phase 1 · Labour · Counting
Automatic Counting: intake, store and dispatch
Today
3 people count bags at the intake windows, tally lots in the store and count cartons into trucks.
With AI
Cameras count sugar and maida bags at the intake windows and match them with the goods receipt. In the store, AI reads the lot label on each carton stack. At the rear conveyor, it counts every carton going into each truck and matches it with the invoice, with a video clip saved as proof.
After
No dedicated counters. The few exceptions are flagged on the dashboard and handled by the dispatch and store staff already on duty.
Benefit
3 counting roles freed for the new shifts. No more short-supply or short-shipment arguments; every truck has video proof. We have built AI counting solutions before, so this is the lowest-risk place to start.
UC2Phase 1 · Labour · Quality · Recycling
AI Defect Highlighter at the cooling belt
Today
6 workers scan the moving belt by eye at two or three points and pick out bad biscuits. Even so, some defective biscuits are missed and reach the packing zone. Picked biscuits go for recycling, but nobody knows exactly how many, or why.
With AI
A high-speed AI camera looks at every biscuit as it leaves the cooling section and spots broken, burnt, under-baked, misshaped and double biscuits, and any foreign matter. A belt-speed sensor tracks where each bad biscuit is, and a light shines directly on it as it reaches the pick zone. The picker no longer searches; they simply lift out the biscuits that are lit up. Nothing is blown or pushed off the fast-moving belt.
After
One pick zone instead of two or three check points, with 2 pickers per shift. As accuracy is proven and defects fall (UC7), the pick zone needs fewer people still.
Benefit
4 people per shift freed, and far fewer defects reaching packing. Every biscuit sent to recycling is counted by type and by hour, so the recycling loop is measured for the first time and the Bake-Eye (UC7) can fix the cause, not just the biscuit.
UC3Phase 1 · Management
Executive Dashboard with Ask-AI
Today
The latest status comes through phone calls, registers and month-end reports.
With AI
One live screen and mobile app showing output, rejects by type, fuel per tonne, people per tonne, trucks dispatched and ₹ saved against the baseline. On top of it sits Ask the Plant: type or speak a question in plain English or Hindi, ChatGPT-style, such as "How many cartons went to the depot today?" or "Why were rejects high in Shift B?", and get the answer in seconds from the plant's own data.
After
You and your plant head can see the plant from anywhere, at any hour, including the night shift.
Benefit
Decisions in minutes, not days. Every saving from every use case is visible from the first week, so the decision to fund the next phase is based on your own numbers.
Phase 2 · Months 3–6
Same people, three shifts
These four use cases free enough hands, and train people fast enough, to run three shifts with the same 21 people.
UC4Phase 2 · Labour · Giveaway
Pack Inspection and Giveaway Control
Today
4 checkers look at seals, wrapper print and batch/MRP/date codes, and weigh sample packs.
With AI
A camera at the outfeed of each packing unit checks the seal and print and reads the batch, MRP and date code. Checkweigher data is checked for 100% of packs. Bad packs are pushed out automatically with a photo of the reason. AI watches the average pack weight and tells the operator exactly how much to trim the fill.
After
1 operator per shift.
Benefit
3 people per shift freed, plus about ₹22.5 lakh a year from less pack giveaway at three-shift volume. Every pack meets legal metrology rules, with photo proof.
UC5Phase 2 · Labour
AI Lane Assist before packing
Today
8 workers walk the 20–25 lanes, turning, flipping and straightening biscuits so that the packing machines do not jam.
With AI
Cameras above the lane-forming section spot every tilted, flipped or overlapping biscuit, and every lane that is about to jam or run empty. A pointer light and a lane screen show the worker exactly which biscuit to fix and where, so nobody has to scan all the lanes by eye. Better lane guides, tuned with the camera data, cut down how often biscuits turn in the first place.
After
4 people per shift look after all the lanes.
Benefit
4 people per shift freed, and fewer packing-machine jams. We have deliberately kept people in the loop here: a fully robotic aligner is very hard to build for a fast biscuit line, so we keep it as a future option, to be tried only if Lane Assist data shows it is worth it.
UC6Phase 2 · People
GenAI Training Buddy
Today
New people learn by watching seniors for weeks. Moving people to new stations or night shifts means retraining them by hand.
With AI
A GenAI assistant on workers' phones and a shop-floor tablet, built from your own SOPs and the know-how of your best operators. It gives short video SOPs for every station, answers spoken questions in Hindi or English ("What does a red alert on the sorter mean?"), and runs quick quizzes and a sign-off before a person works a station alone.
After
A new or moved person is ready for a station in days, not weeks. Supervisors can see who is trained for what.
Benefit
Makes the move to three shifts smooth, reduces dependence on a few experienced hands, and keeps quality the same on every shift.
UC7Phase 2 · Fuel · Quality
Bake-Eye: bake colour watch
Today
The operator sets zone temperatures from experience and keeps a safety margin. Bake colour is checked by eye, now and then.
With AI
A colour camera at the oven exit measures the bake colour, size and spread of every row. AI learns how zone temperatures and belt speed affect the result, and recommends the lowest steady temperature profile that still gives the right golden colour. It starts as advice; settings are changed only by your operator.
After
The safety margin comes down safely, because the camera is watching every row.
Benefit
Less fuel per tonne, and fewer under-baked or over-baked biscuits going to recycling.
Phase 3 · Months 6–9
Less fuel per tonne, healthier machines
Deeper oven work and machine health, once the plant is running three shifts.
Swipe sideways to see the whole diagram
Figure 6. The smart oven: cameras at entry and exit, sensors on fuel and flue, and one AI brain advising steady, efficient settings.UC8Phase 3 · Fuel
Combustion Optimiser
Today
Burners run at settings fixed long ago. The air-to-fuel ratio drifts, and the oven is heated up from cold every day.
With AI
A fuel flow meter and flue gas O₂ and temperature sensors show how efficiently the fuel is burning. AI fine-tunes the air-to-fuel ratio and zone setpoints for steady, efficient firing. We do not switch burners up and down to save fuel; that costs more than it saves and strains the oven. Instead, the entry camera helps keep the belt evenly loaded, and running three shifts removes most of the daily warm-ups.
After
Fuel per tonne is shown live, shift by shift, on the dashboard.
Benefit
UC7 + UC8 + three-shift running together: 8–12% less fuel per tonne, about ₹24 lakh a year at three-shift volume.
UC9Phase 3 · Fuel · Uptime
Oven Health Watch
Today
Heat leaks, damaged insulation and weak burner fans are found only when something fails or the bill goes up.
With AI
A thermal camera scans the oven body, doors and flue for heat leaks. Vibration and current sensors watch burner fans and belt motors. AI warns the maintenance team weeks before a breakdown.
After
Repairs are planned, not panic.
Benefit
Protects the fuel saving over the years and avoids unplanned oven stops, which waste both fuel and dough.
Use case
What it does
Why it matters
UC10 · Dosing Watch
Reads the sugar and maida dosing machines batch by batch and flags any drift from the recipe (~75 kg sugar, ~270 kg maida).
Same dough every batch means the same bake, fewer rejects and no material overuse.
UC11 · Predictive Maintenance
Watches mixers, conveyors and packing machines and warns before a breakdown. Many machines already have sensors that are not switched on or connected; we enable those, and add low-cost vibration and current sensors where they are missing.
Less unplanned downtime, which matters more once the plant runs round the clock.
UC12 · Hygiene & Safety
Cameras check hairnets, gloves and masks, and alert on entry into restricted zones.
Always ready for FSSAI and brand-owner audits, on every shift.
Chapter 4
A day at your plant, after full implementation
It is a Monday in 2027. The plant now runs round the clock in three 8-hour shifts, with the same 21 people on these jobs. Here is how the day goes.
6:00 am
Shift A starts. Seven trained people take their places: two at the highlighter pick zone, four at the lanes and one at the packing units. Counting runs on its own. They used to be part of the old 12-hour day shift.
6:40 am
The Bake-Eye notices biscuits in one part of the belt getting slightly darker and advises lowering zone 3 by a few degrees. The operator accepts with one tap. No reject, no wasted fuel.
9:20 am
On the cooling belt, the highlighter lights up one cracked biscuit and two pale ones. The picker lifts them out without searching. Each is logged on the dashboard as sent to recycling, by type.
11:30 am
The Lane Assist light picks out two flipped biscuits in lane 7. The operator fixes them in seconds and the packing unit never jams.
2:00 pm
Shift B takes over. A truck for the depot is loaded: 1,240 cartons on the camera count, 1,240 on the invoice. Matched, with video saved.
6:30 pm
On your phone you ask, "How much did we pack today and what was fuel per tonne?" The dashboard answers in seconds.
11:00 pm
Shift C runs the night. The picker at the highlighter used to scan the belt by eye on the old day shift. She learnt her new role in a week on the GenAI Training Buddy, in Hindi.
Before and after
What we measure
Today
After full implementation
Shifts
1 (7 am – 7 pm)
3, round the clock
People on these jobs
21
The same 21
Output
~15 tonnes a day
~30 tonnes a day (2×)
Labour cost per tonne (these jobs)
~₹896
~₹448
Oven fuel per tonne
Today's level
8–12% lower
Oven warm-ups
Every day
Mostly removed
Quality check coverage
By eye, at 2–3 points
100% of biscuits, by camera
Defects reaching packing
Some slip past the manual checks
Each one lit up for removal
Biscuits sent to recycling
Not measured
Measured by type, and falling
Training a new person
Weeks, by watching
Days, with the GenAI Training Buddy
Management view
Calls and month-end reports
Live dashboard; ask in plain language
Carton count at dispatch
Manual
Automatic, with video proof
Swipe sideways to see the whole diagram
Figure 7. From one 12-hour shift to three 8-hour shifts, with the same 21 people.
Chapter 5
What it means in rupees
Swipe sideways to see the whole diagram
Figure 8. Annual benefit at full run-rate (three shifts), base case.
Labour cost avoided is money you will not have to spend: running three shifts the old way would need 63 people on these jobs. With AI, the same 21 people do it (7 per shift), so 42 hires are never needed. The conservative case allows for 8 people per shift, for example a third picker or a counting helper.
Benefit
How we calculate it
Conservative
Base case
Labour cost avoided (UC1, UC2, UC4, UC5)
Hires avoided for two extra shifts × ₹1.92 lakh a year
₹74.9 lakh (39 hires)
₹80.6 lakh (42 hires)
Oven fuel (UC7, UC8, 3 shifts)
% saved × ₹240 lakh yearly fuel at three-shift volume
₹19.2 lakh (8%)
₹24.0 lakh (10%)
Less giveaway (UC4)
Overfill cut × 9,000 t a year × ₹50 per kg
₹13.5 lakh (0.3%)
₹22.5 lakh (0.5%)
Less recycling (UC2, UC7)
Cut in the 2% of output sent to recycling × 9,000 t × ₹35 per kg net cost of the loop
₹12.6 lakh (20% cut)
₹18.9 lakh (30% cut)
Total per year
₹120.2 lakh
₹146.0 lakh
₹1.92 L
every year for each hire avoided
₹2.4 L
every year for each 1% of oven fuel saved
₹45 L
every year for each ₹1/kg of contribution on the extra 4,500 t
Even in the conservative case, labour and fuel alone bring about ₹94 lakh a year, and the plant makes twice as many biscuits with the same people. These benefits repeat every year and grow as wages and fuel prices go up.
Chapter 6
How we build it, end to end
One partner, one responsibility. ThirdEye Data designs, supplies, installs, integrates and supports the full system (cameras, sensors, edge AI boxes, highlight and pointer lights through our hardware partners, and all the software), so you deal with one team for everything.
Swipe sideways to see the whole diagram
Figure 9. Eyes see, the edge brain decides, smart hands act, and the executive dashboard shows the result.
Runs on your shop floor. AI decisions are made on rugged edge boxes next to the line, in milliseconds, and keep working even if the internet goes down.
Works with what you have. We connect to your oven panel, dosing machines, packing units, checkweighers and ERP or Tally. No change to your recipe or main machines.
Machine data, switched on. In the baseline study we check every machine for built-in sensors and data ports, enable what is already there, and add low-cost sensors only where needed.
Proof built in. Every reject, every bad pack and every truck count is saved with a photo or video clip.
The roadmap
Swipe sideways to see the whole diagram
Figure 10. Three phases over about nine months. Two shifts from month 5, three shifts from month 7.
Phase
When
What we deliver
What you get
Phase 0 · Baseline & sensor audit
Weeks 1–2
Measure manpower, output, fuel, rejects and pack weights. Check which machines have sensors we can switch on. Fit a fuel flow meter. Agree the baseline and success measures in writing.
The scorecard
Phase 1 · Quick wins
Months 1–3
UC1 Automatic Counting, UC2 AI Defect Highlighter, UC3 Executive Dashboard with Ask-AI
Results you can see; first people freed
Phase 2 · Same people, 3 shifts
Months 3–6
UC4 Pack Inspection, UC5 AI Lane Assist, UC6 GenAI Training Buddy, UC7 Bake-Eye
Robotic biscuit aligner, only if Lane Assist data shows a clear case
Decided on data
Chapter 7
What about the people?
Nobody needs to lose their job. The people freed by AI are exactly the people who will run the new shifts. Our plan is simple:
Train the best line workers as AI line operators. They work the highlighter pick zone and the lanes, handle exceptions, and keep the cameras and lights clean and calibrated.
Use the GenAI Training Buddy for every move. Each person learns a new station in their own language, at their own pace, and is signed off before working it alone.
Shorter, better shifts. Three 8-hour shifts instead of one 12-hour shift: people stay fresher and more alert.
Better and safer work. Nobody has to stand for hours searching a fast belt by eye; the AI does the searching.
Chapter 8
Why ThirdEye Data
AI and computer vision specialists, with teams in India and the US.
We have built this kind of solution before: AI counting of stacked bags in warehouses, counting auto parts loaded into trucks, and tile counting with breakage detection on ceramic lines.
GenAI in production. We build document and knowledge assistants, the same technology behind Ask-AI and the Training Buddy.
End-to-end delivery. From site survey and hardware to software, integration, training and support, under one contract.
Commercial approach: start small, grow with confidence
We suggest starting with Phase 1 as a fixed-scope first step, with success measures agreed upfront. The next phases are released only after you have seen Phase 1 results on your own dashboard. Detailed commercials will follow the baseline study, in the model that suits you best:
Fixed price per phase, with payment linked to the go-live of each phase.
Monthly subscription, with hardware, software and support included, so there is little upfront spend.
Savings-linked, where part of our fee is tied to the savings measured on the dashboard against the agreed baseline.
Next steps
Let us take the first step together
1
Review meeting
A one-hour meeting with you and your plant head to walk through this proposal and answer questions.
2
Baseline and sensor audit (2 weeks)
Our team on your floor, measuring manpower, output, fuel, rejects and pack weights, and checking machine sensors. You get a baseline report either way.
3
Phase 1 kick-off
Automatic Counting, the AI Defect Highlighter and the Executive Dashboard go live within about three months.
What we will need from your side
One point of contact from the plant, and access for our team during the baseline study
Last 6 months of fuel bills and daily production figures
Manpower list by station
List of machines with any built-in sensors, PLC or data ports
Existing SOPs or training material, for the GenAI Training Buddy
Power, network and mounting points at the camera locations
Biscuit No. 1 will taste exactly the same. It will just be made round the clock, by the same people, with less fuel in every tonne.
Appendix
Assumptions used in this proposal
All values below are working assumptions. They will be replaced by measured values in the baseline study.
Item
Assumed value
Source
Shift pattern today
1 shift, 7 am – 7 pm (12 hours)
Confirmed
Output today
~1.25 t per hour → ~15 t a day → ~4,500 t a year (300 days)
Estimate; to be confirmed
Output after AI
3 × 8-hour shifts → ~30 t a day → ~9,000 t a year
Same line rate
Batch size
~270 kg maida + ~75 kg sugar per batch
Site visit notes
Oven
~360 °C, ~3.5 min bake on a running belt; brought up to heat daily with one shift